Quantcast Tank  Thermal  Sight,

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Tank Thermal Sight,
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Control  Unit,  Image  
Up
TM-750-116 Topographic Support System (TSS) Downsized Direct Support Section (DDSS) Manual
Next
Weapon Sight
TM   750-116 i. Tank  Thermal  Sight, (1)  Commander’s  Display  (fig.  3-59) Figure  3–59  Commander’s  Display (a) Perform  purging  and  charging  procedure  para 2-5.a. (b) Purge instrument at 8 psig for 5 minutes. (c) Ensure relief valve closes at 5 psig. (d) Leak test for minimum of 5 minutes. (2)  Gunner’s  Display  (fig.  3-60).  Refer  to  para 3-13.i.(1) for procedures. Figure  3-60  Gunner’s  Display (3) Head  Assembly  (fig.  3-61).  Refer  to  para 3-13.i.(1) for procedures. Figure  3-61  Head  Assembly (4)  Power  Converter  (fig.  3-62).   Refer  to  para 3-13.i.(1) for procedures. Figure  3-62  Power  Converter 3-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +