Quantcast Late  Production

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Late Production
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Infrared  Body  Assembly
Up
TM-750-116 Topographic Support System (TSS) Downsized Direct Support Section (DDSS) Manual
Next
Purging  and  Charging  the  Head  Assembly
TM 750-116 (2)  Late  Production  (fig.  3-28). Figure  3-28  M42  Tank  Periscope  -  Late  Production (a) Perform  purging  and  charging  procedure  para 2-5.b. (b) Purge instrument at 5 psig for 5 minutes. (c) Charge  instrument  at  1  psig  for  10  seconds. (d) Leak test for minimum of 5 minutes. (3) Modified Production (fig. 3-29).  Refer to para 3-10.h.(2) above for procedures. Figure  3-29  M42  Tank  Periscope  -  Modified Production i. Periscope, M44A Tank (figs. 3-30 through 3-32. ENSURE THAT THE VEHICLE MASTER SWITCH AND THE PERISCOPE EMER- GENCY SWITCH ARE IN THE OFF POSI- TION. THE HIGH VOLTAGE AND LOW AMPERAGE OF THE POWER PACK IS NOT DANGEROUS; HOWEVER, IF THE HIGH  VOLTAGE  PARTS  ARE  TAM- PERED WITH, AN ELECTRICAL SHOCK MAY  RESULT. Do not expose periscope to bright light; pro- longed exposure may cause damage to image conversion tube. NOTE Special plate assemblies are provided for purg- ing and charging when the head assembly and body assembly are separated. These plates are also used for shipment and storage of the peri- scope. (1) Purging and Charging in the Installed Posi- tion (fig. 3-30). Figure  3-30  M44A  Series  Tank  Periscope (a) Perform  purging  and  charging  procedure  para 2-5.b. (b) Purge instrument at 5 psig for 10 minutes. (c) Charge instrument at 1 psig for 20 seconds. (d) Leak test for minimum of 5 minutes. 3-13

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +