Quantcast Telescope,  Mount,  M187  (fig.  3-16).

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Telescope, Mount, M187 (fig. 3-16).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
MOUNTS,  TELESCOPE.
Up
TM-750-116 Topographic Support System (TSS) Downsized Direct Support Section (DDSS) Manual
Next
PERISCOPE,  M65  BATTERY  COM- MANDERíS
c.  Telescope  Mount,  M149/M149E1 NOTE (fig.  3-15). Mount must be removed from installed position for purging and charging operations. Refer to ap- pendix A for a listing of applicable publications. Figure   3-15   M149/M149E1   Telescope   Mount (1) Remove inlet port cap and outlet screw on M149 Telescope Mount. Do not remove poppet valve on M149E1 Telescope  Mount. (2) Perform  purging  and  charging  procedure  para 2-5.b for M149 and para 2-5.a for M149A1. (3) Purge M149 Telescope Mount at 5 psig and M149E1 Telescope Mount at 3 psig. Maintain pressure for 10 minutes. (4) Charge instrument at 1 psig for 40 seconds. (5) Leak test for a minimum of 5 minutes. TM   750-116 d.  Telescope,  Mount,  M187  (fig.  3-16). HANDLE WITH CARE. IN THE EVENT THE RADIOLUMINOUS SOURCE IS BROKEN, CRACKED, OR SUDDENLY LOSES ILLUMINATION, DO NOT AT- TEMPT TO REPAIR. IMMEDIATELY DOUBLE WRAP INSTRUMENT IN PLAS- TIC AND NOTIFY THE LOCAL RADI- ATION PROTECTION OFFICER (RPO). (1) 2-5.a. (2) (3) (4) (5) Figure  3-16  M187  Telescope  Mount Perform purging and charging procedure para Relief valve should open between 3-10 psig. Purge instrument for 5 minutes. Relief valve should close between 1-5 psig. Leak test for minimum of 5 minutes. 3-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +