Quantcast Figure 3. AFFF Pump Coupling Detail

 

Click here to make tpub.com your Home Page

Page Title: Figure 3. AFFF Pump Coupling Detail
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 1. AFFF Pump Motor Junction Box
Up
TM-55-1925-292-14-P Firefighting Fire Alarm and Fire Suppression Systems Inland and Coastal Large TUG (LT) Manual
Next
INSTALLATION - TM-55-1925-292-14-P0256
TM 55-1925-292-14&P
0028 00
8. Slide the motor coupling flange (figure 3, item 2) towards the AFFF pump motor (figure 3, item 3).
9. Remove the four bolts (figure 3, item 4), four lockwashers (figure 3, item 5), and four flat washers (figure 3,
item 6). Discard the four lockwashers.
WARNING
Heavy loads can crush. Do not allow any body parts to come under the load or
between the load and a stationary object. Death or serious injury can result.
10. Use a sling and chain hoist to remove the AFFF pump motor (figure 3, item 3) from its foundation.
11. Slide the motor coupling flange (figure 3, item 2) off the motor shaft (figure 3, item 7).
3
2
1
8
7
4
5
6
Figure 3. AFFF Pump Coupling Detail
0028 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +