Click here to make tpub.com your Home Page

Page Title: PREVENTATIVE MAINTENANCE CHECKS AND SERVICES FOR WATER WASHDOWN SYSTEM (WWS)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-243-24&P
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
6
Post system
FM-200 piping and
General Support
Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing
LCU-2K-5553-1.
7
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Recertification.
PREVENTATIVE MAINTENANCE CHECKS AND SERVICES FOR WATER WASHDOWN SYSTEM (WWS)
The following provides the preventative maintenance checks and services required to maintain each WWS in a fully
operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Weekly
Control valve
Crew
Charge fire main to operating pressure,
perform a visual inspection to verify WWS is
free of leaks. If leaks are discovered, repair
Control Valve.
2
Monthly
Control valve
Crew
Verify fire main is not charged.
Inspect control valve handle locking
mechanism to ensure it is free and operates
properly. Exercise WWS control valve by
unlocking valve handle and operating control
valve through two (2) openings and closings.
Close valve and verify lock is engaged. If
control valve fails to operate, repair or
replace.
3
Monthly
Strainer blow off
Crew
Verify fire main is not charged.
Exercise WWS strainer blow off procedure
through two (2) openings and closings. Leave
WWS strainer blow off valve in closed
position. If valve fails to operate, replace
valve.
4
Post system
Complete system
General
Test the system per testing requirements
disassembly
Support
identified on Drawing LCU-2034-5231-1. If
system fails to meet test requirements, repair
system, and retest system.
5
Triennial
Control valve, strainer,
General
Perform a flow test. Refer to drawing LCU-
and piping
Support
2034-5231-1 for system flow requirements. If
system fails to meet flow requirements, repair
Bow Thruster Emergency Fire Pump and/or
Engine Room Fire Pump(s) and retest.
6
Post system
Strainer
Crew
Remove, clean, and reinstall strainer basket.
activation
6