Quantcast Installation - TM-5-4210-233-14P-1_477

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
HEATER CONTROL HEAD ASSEMBLY - TM-5-4210-233-14P-1_476
Up
TM-5-4210-233-14P-1 Twin Agent 4x4 Firefighting Truck Model No. CM-KFT-B Manual
Next
HEATER VALVE - TM-5-4210-233-14P-1_478
TM 5-4210-233-14&P-1 4-102.  HEATER CONTROL HEAD ASSEMBLY-Continued (3)   Tag and disconnect electrical leads from heater control. (4)   Tag two cables on heater control (9). (5)   Loosen nuts (1 0) and remove cables (11)from heater control. b. Installation. (1)   Install cables (11) through slots in heater control and secure cables with nuts (10). (2)   Connect electrical leads to heater control. Remove wire tags. (3)   Secure heater control (9) to panel (3) with two screws (4) and two screws (5), two flat washers (6), two lockwashers (7), and two hex nuts (8). (4)   Tilt plate (3) upwards and secure to dashboard with two screws (1) and washers (2). c. Follow-on Maintenance. (1)   Connect batteries (see para 4-114). 4-348

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +