Quantcast Assembly - TM-5-4210-233-14P-1_366

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Cleaning and Inspection - TM-5-4210-233-14P-1_365
Up
TM-5-4210-233-14P-1 Twin Agent 4x4 Firefighting Truck Model No. CM-KFT-B Manual
Next
TANK FILL AND RECIRCULATING VALVE - TM-5-4210-233-14P-1_367
TM 5-4210-233-14&P-1 4-45.  #1, #2, #3 and #4 DISCHARGE VALVES - Continued d. Assembly. CAUTION Apply   silicone   grease   (Item   11,   Appendix   E)   to   all   O-rings   before   assembly. Failure to do so could result in damage to O-rings. (1) Install new O-rings (27) and (28). (2) Install ball (24) in valve body (15). (3) Install new O-ring (26) on upper stem bushing (25). (4) Install upper stem bushing (25). (5) Install new O-ring (23). (6) Place four new springs (22) in holes of new seal (21). (7) Install new O-ring (20) on seal retainer (19). (8) Assemble seal (21) and seal retainer (19), and install on valve body (15). (9) Install four socket head capscrews (18). e. Installation. (1) Install new O-ring (17). (2) Install valve (15) in mounting flange (16) and rotate to secure in place. (3) Tighten four capscrews (14). (4) Apply pipe sealant (Item 2, Appendix E) to pipe nipple (12) and hose adapter (13) threads. (5) Install pipe nipple (12) and hose adapter (13). (6) Secure plate (11) to valve body (1 5) with four capscrews (10). (7) Secure sector (7) in position marked when removed to shaft (8) with roll pin (9). (8) Install U-bolt (6), bracket (5), two lockwashers (4), and two hex nuts (3). (9) Install pressure hose (2) and drain hose (1). f. Follow-on Maintenance. (1) Install Curbside Pump Panel (see para 4-26). (2) Connect Batteries (see para 4-114). 4-237

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +