Quantcast Follow-on Maintenance -706881049

 

Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Inspection -706881048
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
APU CRANKSHAFT, BEARINGS AND SEALS -706881050
TM 5-4210233-14&P-1
5-70. APU CAMSHAFT, GEAR AND BEARINGS- Continued
(2)
Use three screws (4) to attach ball race (7) and gear center (6) to camshaft gear (5).
(3)
Slide thrust washer (8) onto camshaft (3).
(4)
Install key (10), and press new camshaft gear assembly (2) onto camshaft (3).
(5)
Lay engine on side and install valve tappets.
(6)
Install camshaft, aligning timing mark on camshaft gear with timing mark on crankshaft gear.
d.
Follow-on Maintenance.
(1)
Install governor cup (see para 5-69).
(2)
Install flywheel (see para 5-67).
(3)
Install fuel transfer pump (see para 4-216).
(4)
Install Injection Pump (see para 5-78).
(5)
Install gear cover (see para 5-68).
(6)
Install APU (see para 4-207).
5-378

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +