Quantcast Installation -706880849

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Pump Cartridge Repair-continued
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
OIL PAN -706880850
TM 5-4210-233-14&P-1
5-26. POWER STEERING PUMP - Continued
c.
Installation.
(1) Apply pipe sealant (Item 2, Appendix E) to all fittings.
(2) Remove protective plugs from pump ports and install fittings (10 thru 14).
(3) Install new gasket (8) and pump (5) making sure key in shaft engages drive slot.
(4) Secure pump (5) with two lockwashers (7) and two capscrews (6).
(5) Connect hoses (1, 2, 3 and 4) to pump.
e. Follow-on Maintenance.
CAUTION
To prevent damage to pump vanes, be sure power steering
reservoir is refilled before starting engine.
(1) Refill power steering reservoir with Dexron II, (Item 12, Appendix E).
(2) Connect batteries (see para 4-114.).
(3) Start main engine and check hose connections for leaks and, if necessary, tighten fittings.
(4) Turn the steering wheel fully left and fully right and make sure the response to turning is smooth and
easy.
(5) Install curbside operator panel (see para 4-26).
5-179

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +