Quantcast Assembly-continued -706880809

 

Click here to make tpub.com your Home Page

Page Title: Assembly-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Assembly-continued -706880808
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Assembly-continued -706880810
TM 5-4210-233-14&P-1
5-22.
BLOWER REPAIR - Continued
(50)
Turn blower (7) right side up and
place 0.010-in. (0.254 mm) feeler
gage between rotor lobes (29 and
30). Rotate rotors while gage is
installed.
(51)
Remove feeler gage.
NOTE
To increase or decrease gap between leading edge of right rotor lobe and trailing
edge of left rotor lobe (30), do steps (52) through (55).
(52)
Install puller tool on left timing gear (23) with two screws.
(53)
lnstall puller tool on right timing gear (22) with three screws.
(54)
Tighten puller screws evenly to remove timing gears (22 and 23).
5-139

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +