Quantcast Assembly-continued -706880807

 

Click here to make tpub.com your Home Page

Page Title: Assembly-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Assembly-continued -706880806
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Assembly-continued -706880808
TM 5-4210-233-14&P-1
5-22.
BLOWER REPAIR - Continued
(38)
Place 0.004-in. (0.102 mm) feeler gage between
rotor lobes (29 and 30). Rotate rotors while gage
is installed.
(39)
Remove feeler gage.
(40)
Turn blower (7) upside down and place 0.004-in.
(0.1 02 mm) feeler gage between rotor loves (29
and 30). Rotate rotors while gage is installed.
(41)
Remove feeler gage.
NOTE
To increase or decrease gap between trailing edge of right rotor
lobes and leading edge of left rotor lobes, do steps (42) through
(45).
(42)
Install puller tool on left timing gear (23) with two screws.
(43)
Install puller tool on right timing gear (22) with three screws.
NOTE
Place clean, folded shop towel between blower rotors to keep
gears from turning.
(44)
Tighten puller screws evenly to remove gears (22 and 23).
5-137

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +