Quantcast Assembly-continued -706880776

 

Click here to make tpub.com your Home Page

Page Title: Assembly-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Assembly-continued -706880775
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Assembly-continued -706880777
TM 5-4210-233-14&P-1
5-18. ALTERNATOR-Continued
(16)
Torque screws and nuts as follows.
(a) Outside terminal nut (1) -50 lb in. (5.5
NĚ ).
m
(b) Rectifier bridge screws (2)-25 lb in.
(2.8 NĚ ).
m
(c) Capacitor screw (3)-22 lb in. (2.5
NĚ ).
m
(d) Relay and inside terminal nuts (4) -22
lb in. (2.5 NĚ ). It may be necessary
m
to hold terminal on outside while
tightening.
(e) Regulator mounting screw (grounding)
(5)-20 lb in. (2.2 NĚ ).
m
(f) Regulator attaching screws (6)-20 lb
in. (2.2 NĚ ).
m
(g) Regulator nut (7)-22 lb in. (2.5 NĚ ).
m
(h) Brush holder pivot screw (8)-20 lb in.
(2.2 NĚ ).
m
(17)
Install outside washer, lock washer and
nut on outside stud.
(18)
Install stator (1) in frame (9) with phase
leads (2) over studs (4) on rectifier
bridge.
(19)
Install nuts (24) on studs to secure
stator leads. Tighten nuts to a torque
of 22 lb in. (2.5 NĚ ).
m
(20)
Clean slip rings by holding 400 grain
polishing cloth (A) (Item 63, Appendix
E) and spinning rotor (16). Place
frame (20) and rotor in a vise (B).
5-106

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +