Quantcast Assembly -706880747

 

Click here to make tpub.com your Home Page

Page Title: Assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Testing -706880746
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Assembly-continued -706880748
TM 5-4210-233-14&P-1
5-14. STARTER REPAIR AND TESTING - Continued
(5)
Test field coil. Place red (+) lead on field terminal stud (12). Place black (-) lead on field frame
(13). Multimeter needle must not move.
(6)
Place red (+) lead on field terminal stud (12). Place black (-) lead on one of field leads (1 4).
Multimeter needle must move.
(7)
Move black (-) lead to other field leads (14). Multimeter needed must move.
(8)
Place red (+) lead on one field lead (14). Put black (-) lead on another field lead. Multimeter
needle must move. Repeat for all leads.
(9)
Replace any defective parts as necessary.
d. Assembly.
(1)
Install insulator bushing (1) on terminal stud (2).
(2)
Install field coil (3) in field frame (4) and put terminal stud (2) through hole (5).
(3)
Align holes in plate insulator (6) with holes in field frame (4) and install around top of field coil (3).
5-77

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.