Quantcast Follow-on Maintenance -706880737

 

Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation -706880736
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
STARTER REPAIR AND TESTING -706880738
TM 5-4210-233-14&P-1
5-13. STARTER SOLENOID - Continued
(5)
Install four screws (9) into starter (4).
(6)
Install ground lead (10) and nut (11).
(7)
Install nut (12) on motor terminal (2). /
(8)
Install nut (13) on field terminal (6).
(9)
Connect ground lead (10) to terminal (14) on starter (4) with lockwasher (15) and nut (16).
c.
Follow-on Maintenance.
(1)
Install starter (see para 5-12).
(2)
Connect batteries (see para 4-114).
5-67

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.