Quantcast Installation-continued -706880730

 

Click here to make tpub.com your Home Page

Page Title: Installation-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation-continued -706880729
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Follow-on Maintenance -706880731
TM 5-4210-233-14&P-1
5-11. ENGINE ASSEMBLY - Continued
(34) Install ether start heat sensor (45) in thermostat housing at left front top of engine with bolt (46).
(35) Put air cleaner clamps (47) in position and install hex head screws (48), flat washers (49) lock washers
(50) and nuts (51). (36) Install air cleaner (52) and tighten clamps (47)
(37) Install flex hose (53) and tighten two clamps (54).
(38) Install elbows (55) and air intake hose (56) between air cleaner and turbocharger. Install lc mps (57
a
and 58).
(39) Connect air cleaner indicator hose (59) to air intake tube (56).
NOTE
Plastic tie-straps should be used as needed to secure loose
hoses, tubes and wiring. This should be done to prevent looses
items from being caught by moving parts, and also to prevent
chafing of parts due to vibration.
5-60

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +