Quantcast Installation -706880568

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
POWER STEERING GEAR -706880567
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
POWER STEERING RESERVOIR -706880569
TM 5-4210-233-14&P-1
4-161. POWER STEERING GEAR - Continued
(4) Remove pitman arm nut (5) and bolt (6).
(5) Make timing marks on pitman arm (7) and sector shaft (8).
NOTE
A chisel will help you loosen the pitman arm. Use only a puller if you cannot
remove the pitman arm with your hands.
(6) Remove pitman arm (7).
(7) Loosen nut (9) on bolt (9A) and disconnect steering shaft (10) from steering gear (11).
(8) Remove six bolts (12) and six washers (13) securing steering gear to frame and remove
steering gear (11).
b. Installation.
(1) Secure steering gear (l1) to frame with six washers (13) and six bolts (12).
(2) Connect steering shaft (10) to steering gear (11) and tighten nut (9) to 35 ft lb (48 NĚ ).
m
(3) Install pitman arm (7) on sector shaft (8) making sure timing marks are aligned.
(4) Install bolt (6) and pitman arm nut (5).
(5) Torque bolt (6) to 300-320 ft. Ibs. (407-434 NĚ ).
m
(6) Connect hoses (1 and 2) to proper fittings (3 and 4) on steering gear (11).
c. Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
(2) Bleed air from steering system (see para 4-162).
4-439

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +