Quantcast Installation -706880479

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
HEATER VALVE -706880478
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
HEATER/DEFROSTER -706880480
TM 5-4210-233-14&P-1
4-103. HEATER VALVE-Continued
(2) Remove four screws (2) and shield (3) under cab at right front corner of truck.
(3) Loosen two hose clamps (4).
(4) Remove hoses (5) from valve (6) and drain fluid from hoses and heater core into suitable container.
(5) Remove cable (7) from valve (6).
b. Installation.
(1) Install cable (7) on valve (6).
(2) Install hoses (5) and hose clamps (4) on valve (6).
(3) Tighten hose clamps (4).
(4) Install shield (3) with four screws (2).
(5) Check coolant level in radiator. Add coolant
(Item 29, Appendix E) if necessary (see para 3-6).
c.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
4-350

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +