Quantcast MIRRORS -706880441

 

Click here to make tpub.com your Home Page

Page Title: MIRRORS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
WINDSHIELD -706880440
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
Installation -706880442
TM 5-4210-233-14&P-1
4-80. MIRRORS
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section lll, Item 1) APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
NOTE
Removal and installation of the left hand
mirror is detailed.
The procedure for
removal and installation of the right hand
mirror is similar.
a. Removal.
(1) Remove two screws (1), lockwashers (2)
and flatwashers (3). Remove mirrors (4)
and (5) from brackets (6).
(2) Remove screw (7), washer (8), nut (9),
flatwasher (10), plastic washe (11) and
r
rubber grommet (12) from upper mirror
bracket (13).
(3) Remove screw (14), cap (15), rubber
grommet (16), spacer (17), toothed washer
(18), flatwasher (19) and nut (20) from
lower mirror bracket (21).
(4) Remove two screws (22), lockwashers (23)
and flatwashers (24). Remove upper
mirror
bracket (13) from top of cab door.
(5) Remove two screws (25), lockwashers (26)
and flatwashers (27). Remove lower mirror
bracket (21) from cab door.
4-312

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +