Quantcast Installation -706880362

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Assembly -706880361
Up
TM-5-4210-233-14-P-1 Firfighting Truck 100 Ft. Aerial Ladder 1000 GPM Manual
Next
#1, #2, #3 AND #4 DISCHARGE VALVES -706880363
TM 5-4210-233-14&P-1
4-44. #2 CROSSLAY VALVE - Continued
(10) Install roll pin (15) and lock spring (14).
NOTE
Perform step (11) only if handle assembly was disassembled.
(11) Install stop brackets (27) with socket head screws (26).
(12) Install handle assembly, actuator clip (12), handle disc (11), handle washer (10) and socket head
screw (9).
e. Installation.
(1) Apply a thin coat of silicone grease (Item 11, Appendix E) to two new O-rings (8). Install O-rings
(8) in grooves on valve body.
(2) Carefully pull pipe (1) towards curbside and place valve (2) between two flanges (3).
(3) Secure valve (2) with eight bolts (4).
(4) Position control rod (5) and nylon washer(6) on valve handle (7).
(5) Install retaining pin (9) and new cotter pin (10).
f. Follow-On Maintenance.
(1) Install curbside operator's panel (see para 4-26).
(2) Connect batteries (see para 4-114).
4-233

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +