Quantcast INSTALLATION - TM-5-4210-224-14-P0153

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
HOSE ROLLERS REPLACEMENT
Up
TM-5-4210-224-14-P 250 6PM Mini-Pumper Firefighting Truck Model No.:CM-KFT-3 Manual
Next
HOSE BIN DIVIDERS REPLACEMENT.
TM5-4210-224-14&P
4-27. HOSE ROLLERS REPLACEMENT. (Continued)
INSTALLATION
a. Position hose roller (21) into mounted retaining
bracket (22) and secure in place with mounting
bracket (20), bolt (19), washer (18), and hex nut
(17).
b. Position hose roller (16) into mounted retaining
bracket (20) and secure in place with mounting
bracket (15), bolt (14), washer (13) and hex nut
(12).
c. Position vertical hose roller (11) into mounted
retaining bracket (22) and secure in place with
mounting bracket (10), bolt (9), washer (8), and
hex nut (7).
d. Position remaining vertical hose rollers (6) into
mounted retaining brackets (15 and 20) and
secure in place with mounting brackets (4 and 5),
two phillips screws (3), washers (2), and acorn
nuts (1).
e. Install hose bed floors (paragraph 4-26).
4-58

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.