Quantcast Section III.  OPERATING PROCEDURES

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. OPERATING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
FRAME
Up
TM-5-4210-220-12 Truck Firefighting: Powered Pumper: Foam and Water 500-GPM Capacity; Centrifugal Pump Power Takeoff Driven Manual
Next
OPERATING THE VEHICLE
TM 5-4210-220-12 Section III.  OPERATING PROCEDURES. 2-8.  ASSEMBLY AND PREPARA. TION FOR USE. Before starting, driving, and testing the truck carry out oil and lubricant inspection as detailed in Lube Order LO 5-4210- 220-12, fuel up the truck, and fill water and foam tanks. 2-9.  INITIAL ADJUSTMENTS. All subsystems and components requiring adjustments are pre-set by the manufacturer and no special procedures are, therefore, required.  Carry out all routine checks and inspections as detailed in Operator's PMCS Procedures, see para. 2-7. 2-44

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +